Project 60

A guest house made of glued laminated timber with a total area of 63 square meters that is perfect for a countryside getaway
Area
Total area of premises: 63 sqm.

Kitchen-living room area: 26.11 sqm.
Description
Number of floors: 1 floor + mezzanine floor

Number of bedrooms: 1 bedroom + 1 sleeping area on the mezzanine floor

Number of bathrooms: 1 bathroom
Would you like to change the layout?
It's very simple! Schedule a meeting with our architect and based on your ideas, they will create individual layouts.
What is included in the price?
Wooden structure project (Wooden Constructions)
Profiled glued laminated timber for wall (Finnish profile) with antiseptic treatment
Dry, glued, planed beams and posts with antiseptic treatment
Wooden nails for attaching walls
Wooden roof construction project
Roof rafters made of glued laminated or regular dry timber
Counter-lathing (dried planed timber)
Roofing lath made of dried planed board
Fascia board for the roof overhangs
Window and door jambs made of glued wood
About the project
Entering the house, we come into a vestibule where we can take off our shoes and outerwear. There is a bathroom with a shower nearby. Next, we can walk into the living room with a combined kitchen. From the living area, we enter the bedroom. A bonus feature of this house is an additional zone on the mezzanine floor, which can be accessed by climbing the stairs. There is also a possibility to accommodate a sleeping area here.
Ready-made house Project 60
Get a consultation with an architect
Why choose glued laminated timber?
  • Environmentally friendly and safe
    Only high-quality materials are used, including fast-growing timber and certified German BASF glue. The wood maintains a stable microclimate, providing consistent humidity levels between 35-55%.
    1
  • Durable
    The service life is 100 years or more, while maintaining perfect geometry and appearance — with factory antiseptic treatment, sealing of the ends, and further maintenance. Glued laminated timber is 70% stronger than natural timber.
    2
  • Certified materials
    Regular testing is carried out at every stage of production to ensure quality control
    3
  • Prestigious appearance
    A variety of stylistic solutions - from traditional Russian izba to Alpine chalets or modern style houses
    4
  • Economically advantageous
    Requires no finishing, high speed of putting into operation from the foundation to move-in within 2-3 months.
    5
Stages of production
Client's request
Obtaining information from the client and preparing technical specifications
Calculation of the cost of manufacturing the house kit
Design stage (if there is no project documentation)
Signing a contract for the manufacture of the house kit
Payment of the advance by the client (30-50% of the total cost)
Manufacturing of the house kit (duration of 30 working days)
Issuing the manufactured product to the client
Did you like this house?
Order its presentation and we will answer all your questions.
FAQ
You might also be interested in